Customer case study
Microsoft Dynamics 365 Production Scheduling Development at Vantage Industrial Systems
Engagement summary
Vantage Industrial Systems added one full-time X++ developer from MS Dynamics Guys to its Microsoft Dynamics 365 Finance and Supply Chain Management programme from March to September 2024. The developer delivered a production scheduling extension and three data entities accepted on 30 August. Vantage’s batch history recorded scheduling run time falling from 47 to 12 minutes.
Engagement Facts
| Field | Detail |
|---|---|
| Client | Vantage Industrial Systems, 1,100 employees |
| Industry | Heavy equipment manufacturing |
| Client and delivery locations | Turin, Italy / Lisbon |
| Product | Microsoft Dynamics 365 Finance & Supply Chain Management, version 10.0.38 |
| Roles | 1 F&O X++ developer (full-time) |
| Engagement dates | 18 Mar – 6 Sept 2024 |
| Overlap | 6 hours CET |
| Reporting line | Client F&O Technical Lead |
Why the Client Added Capacity
The heavy equipment manufacturer had approved the scheduling design ahead of a plant opening. Its six Finance and Operations developers were working on a finance upgrade, leaving the production programme without the X++ capacity to build and test the extension before the plant went live.
Decision Rights
| Decision | Owner |
|---|---|
| Development priority | Client F&O Technical Lead |
| Functional design approval | Client Production Planning Manager |
| Code review | Client senior F&O developer |
| Release authorisation | Client F&O Technical Lead |
Work Delivered
The embedded developer built the extension against the approved functional design, including a batch framework and three data entities for the plant integration. The client’s senior Finance and Operations developer reviewed the implementation. The Production Planning Manager owned functional approval, and the client’s Technical Lead prioritised the backlog and authorised the release.
| Role | Assignment | Accepted output | Reviewer | Approver |
|---|---|---|---|---|
| X++ developer | Production-scheduling extension | Production-scheduling extension with a batch framework and 22 automated tests | Client senior developer | F&O Technical Lead |
| X++ developer | Data entities for plant integration | 3 entities; regression suite of 18 cases | Client senior developer | Production Planning Manager |
Outcomes
Azure DevOps records the first accepted change after nine business days. The client’s test and milestone records show 18 passing regression tests and the planned 2 September plant go-live.
| Measure | Baseline | Result | Window | Source |
|---|---|---|---|---|
| Scheduling batch run time | 47 minutes | 12 minutes | 30 days post-release | Client batch history |
| Automated test pass rate | — | 40 of 40 | Aug 2024 | Client test record |
| Regression tests passed | — | 18 of 18 | Aug 2024 | Client test record |
| Plant go-live date | Planned 2 Sept | Met | — | Client milestone log |
| First accepted change | — | 9 business days | Mar 2024 | Azure DevOps record |
Client perspective
“We had the design and no one to build it before the plant opened. The extension passed our regression suite first time.”
Your next step
Discuss the capacity your team needs
Share the application, workstream and specialist allocation you need. Your team can define its own backlog, acceptance and release responsibilities.