Customer case study

Microsoft Dynamics 365 Production Scheduling Development at Vantage Industrial Systems

Engagement summary

Vantage Industrial Systems added one full-time X++ developer from MS Dynamics Guys to its Microsoft Dynamics 365 Finance and Supply Chain Management programme from March to September 2024. The developer delivered a production scheduling extension and three data entities accepted on 30 August. Vantage’s batch history recorded scheduling run time falling from 47 to 12 minutes.

Engagement Facts

Vantage Industrial Systems: engagement facts
FieldDetail
ClientVantage Industrial Systems, 1,100 employees
IndustryHeavy equipment manufacturing
Client and delivery locationsTurin, Italy / Lisbon
ProductMicrosoft Dynamics 365 Finance & Supply Chain Management, version 10.0.38
Roles1 F&O X++ developer (full-time)
Engagement dates18 Mar – 6 Sept 2024
Overlap6 hours CET
Reporting lineClient F&O Technical Lead

Why the Client Added Capacity

The heavy equipment manufacturer had approved the scheduling design ahead of a plant opening. Its six Finance and Operations developers were working on a finance upgrade, leaving the production programme without the X++ capacity to build and test the extension before the plant went live.

Decision Rights

Vantage Industrial Systems: decision rights
DecisionOwner
Development priorityClient F&O Technical Lead
Functional design approvalClient Production Planning Manager
Code reviewClient senior F&O developer
Release authorisationClient F&O Technical Lead

Work Delivered

The embedded developer built the extension against the approved functional design, including a batch framework and three data entities for the plant integration. The client’s senior Finance and Operations developer reviewed the implementation. The Production Planning Manager owned functional approval, and the client’s Technical Lead prioritised the backlog and authorised the release.

Vantage Industrial Systems: work delivered
RoleAssignmentAccepted outputReviewerApprover
X++ developerProduction-scheduling extensionProduction-scheduling extension with a batch framework and 22 automated testsClient senior developerF&O Technical Lead
X++ developerData entities for plant integration3 entities; regression suite of 18 casesClient senior developerProduction Planning Manager

Outcomes

Azure DevOps records the first accepted change after nine business days. The client’s test and milestone records show 18 passing regression tests and the planned 2 September plant go-live.

Vantage Industrial Systems: outcomes
MeasureBaselineResultWindowSource
Scheduling batch run time47 minutes12 minutes30 days post-releaseClient batch history
Automated test pass rate—40 of 40Aug 2024Client test record
Regression tests passed—18 of 18Aug 2024Client test record
Plant go-live datePlanned 2 SeptMet—Client milestone log
First accepted change—9 business daysMar 2024Azure DevOps record

Client perspective

“We had the design and no one to build it before the plant opened. The extension passed our regression suite first time.”

Marta Bellini, F&O Technical Lead

Your next step

Discuss the capacity your team needs

Share the application, workstream and specialist allocation you need. Your team can define its own backlog, acceptance and release responsibilities.